Our buildings require occasional large maintenance projects that exceed the operating budget and are above and beyond regular maintenance work. This bond would address maintenance projects such as roof replacements, HVAC systems, electrical and mechanical systems, plumbing repairs, flooring and paint.

Districtwide energy efficiency projects could save thousands of dollars in annual maintenance and operating costs, which could be allocated toward the classroom. Possible projects include window upgrades and replacing old and inefficient heating and ventilation systems.

Possible maintenance projects include:

Edwin Brown Education Center

  • Asphalt Repair
  • HVAC Pump replacement
  • Reduce chimney height
  • Remove VCT, polish floors
  • Replace exterior windows
  • Replace office carpet
  • Upgrade electrical panels

Tom McCall Elementary

  • Add AC to computer lab
  • Misc roof repair
  • Plumbing upgrades
  • Remodel front office window
  • Repair exterior hard surfaces
  • Reseal exterior brick

Obsidian Middle School

  • Four Classroom addition
  • ADA exterior door hardware
  • ADA restroom upgrade
  • Connect direct to city sewer
  • Electrical service upgrade
  • Fire Alarm System
  • Gym floor refinish
  • HVAC Upgrades
  • Low voltage upgrade
  • Reconfigure classrooms
  • Reconfigure vacated area
  • Remodel CTE
  • Remodel Locker Rooms
  • Replace door and window casing
  • Replace exterior windows
  • Upgrade lighting

Redmond Early Learning Center

  • Add intercom to VOIP
  • HVAC system upgrades
  • Parking lots
  • Replace exterior windows
  • Replace roofs
  • Sidewalk repair

Redmond High School

  • All-weather athletic surface upgrade
  • Art room modernization
  • Auditorium upgrades
  • Concessions/restroom/press box
  • Concrete repair
  • HVAC system upgrades
  • Improve ventilation in science rooms
  • Locker room modernization
  • Replace balance of roofing
  • Replace Hoffman building
  • Upgrade lighting

Terrebonne Community School

  • HVAC Upgrades
  • Recess sprinkler heads in gym
  • Upgrade gym restrooms

John Tuck Elementary

  • ADA exterior doors
  • ADA interior doors
  • Add clock system to VOIP
  • Add floor drain in boiler room
  • Flatwork repair
  • HVAC improvements
  • Replace intercom speakers

Tumalo Community School

  • ADA upgrade interior door hardware
  • ADA upgrade restrooms
  • Add bell and intercom to VOIP
  • Add gym/stage
  • Add small group learning
  • Add visitor parking
  • Electrical service upgrade
  • HVAC remomissioning
  • Modernize interior
  • Parking and drop-off improvements
  • Repair sidewalks
  • Replace exterior windows
  • Replace gym lighting
  • Repurpose gym to kitchen
  • Resurface playground
  • Resurface track
  • Roof repairs

Vern Patrick Elementary

  • HVAC upgrades
  • Low voltage upgrades
  • Paint exterior doors
  • Parking lot drain repair
  • Replace playground equipment
  • Sidewalk repair

Sage Elementary

  • Add AC to second floor
  • Install DDC control system
  • Parking lot crack seal/man hole repair
  • Repair damaged sidewalks